Development of design and detail design documentation. Designer supervision during construction of temporary buildings and structures for the Infectious Diseases Unit. Construction was carried out using quickly erectable structures; the accompanying infrastructure was designed and implemented.
The works involved 25 design engineers, 20 supervisory engineers, 5 industrial engineers.
The work was organised around the clock.
The design stage lasted 2 weeks. The finished project included over 80 km of utilities.
Systems:
ESA, engineering systems automation
AFAS, automatic fire alarm system
PA/GA, public address/general address system
AFPS, automation of the fire protection system
AGES, automatic gas extinguishing system
CEEA IS, civil emergency engineering activities interface system
LAN, local area networks
RCS, radio communication system with Research and Practice Centre for Emergency Medical Care of Department of Health of the City of Moscow
SCS, structured cabling system
RACS, remote access control system
CCTV, closed-circuit television system
IAS, intruder alarming system
TVSS, technological video surveillance system
ECS, electric clock system